The cost of small batches lies in model changeover
For multi-variety and small-batch orders, single-piece processing time is often not the bottleneck. Losses occur during model changeovers: changing molds, tooling, procedures, paint colors, and inspection standards. Each changeover is accompanied by first-piece confirmation and debugging waste. The smaller the batch size, the fewer pieces these fixed losses are spread over, and the higher the unit cost.
The organizational focus has therefore shifted from increasing the tempo to reducing the number of switching times and switching time. To determine whether a workshop is suitable for small batches, it is more meaningful to look at the changeover time rather than the equipment speed.
Production Scheduling and Sharing
Production scheduling is grouped according to materials, colors, surface treatments and molds, concentrating orders of the same family for production within a time window, and arranging colors from light to dark, reducing the number of cleanings and paint changes. The design end promotes commonality: housings of the same series share stud positions, sealing groove sections, and mounting hole spacing. The only difference is the appearance and interface. The investment in molds and tooling can be shared among multiple models.
The inspection end also needs to be unified. Different varieties use the same judgment table and the same sampling ratio to avoid re-discussing the standards for each model. This is also the time cost that is most easily missed for small batch orders.
Delivery commitments must also be given according to the rhythm of model change. The number of varieties that can be accommodated in the same time window is limited. Combining orders with similar processes into groups can better fulfill the promise than pushing all the delivery dates forward, and also reduces the first-piece risk caused by rush work.
Tooling and personnel
Quick-change tooling is the foundation of small batch organization. The fixture uses a unified base with replaceable positioning blocks, the mold waterway and ejection structure are standardized as much as possible, and only the cavity part is replaced when changing molds. In terms of personnel, first article confirmation, parameter recording and exception reporting are written as job actions, and whoever turns on the computer records them, reducing reliance on individual experience. The tooling list and the mold ledger are maintained in the same place, so that the corresponding positioning block will not be found when changing models.
- Group by material, color, surface treatment, color from light to dark.
- The same series share studs, sealing grooves and hole spacing to share the mold investment.
- The unified base speeds up the replacement of positioning blocks and shortens the time for model change.
- First article confirmation and parameter recording fall into post actions.
Weijiaxin serves more than 20 provinces and cities across the country as well as Southeast Asian, European and American markets. In the order structure, small batches of multiple varieties account for a large proportion. Controlling the loss of changeovers is more valuable than pursuing the pace of single pieces.