Error-proofing design for housing assembly lines

Problems to be solved by error prevention

Most of the errors in shell assembly are not technical issues, but the structure allows errors to occur. The left and right parts have similar shapes, the upper and lower covers can be installed backwards, and the length of the screws is only two millimeters different. These may seem harmless during the trial assembly stage, but in mass production they become rework and disassembly. The core idea of ​​​​poka-yoke is to change "rely on people's attention" to "if you pretend to be wrong, you will not be able to pretend."

Three practical approaches

The first is geometric error proofing. Add positioning bosses or notches to asymmetric parts so that they cannot fit when reversed. Make the heads of long screws and short screws have different diameters so that bits cannot be mixed. Such changes need to be synchronized with the mold, with a one-time investment in the early stage and almost zero subsequent maintenance.

The second type is tooling error-proofing. The assembly fixture only leaves one placement position in the correct direction. If the parts are placed backwards, the gland cannot be closed; the torque electric batch set the upper and lower limits, and it is released only when the set value is reached. If it falls below the lower limit, it will not be counted and will prompt for re-typing. The value of the jig is to transfer judgment from the eyes to the hands. The judgment standard is solidified in the tooling, and it will not be out of shape when changing people.

The third type is process error prevention. The materials are divided according to the work station, and only one specification of screws appears in one work station; the sealing rings are distributed according to the set and are supplied only when used up. If there is one more material on the workstation, there will be one more way to make mistakes.

Inspection and Traceability

Whether error proofing is effective requires verification rather than assumption. A common method is to deliberately put in a wrong part to see if the workstation can be stopped. Doing it once a month is more meaningful than a full inspection afterwards. At the same time, the torque sampling data of each batch is recorded. When drift occurs, check the batch calibration first, and then check the thread quality to avoid treating equipment problems as human problems. The number of interceptions at each workstation is counted monthly. A long-term zero interception at a certain workstation often means that the verification link has been skipped, rather than that there are really no errors.

  • First piece confirmation: record the assembly sequence and torque value of each workstation
  • Visualization of the workstation: the diagram shows the correct direction and is posted at eye level
  • Abnormal interception: report when it cannot be installed , on-site repair and make-shift are not allowed
  • Model change confirmation: redo the first article and error-proofing verification after changing specifications

Weijiaxin combines geometric error-proofing and torque control in the assembly process in Tangxia, Dongguan, OEM The project will also provide manufacturability suggestions based on customer drawings, and structures that are easy to install backwards will be modified before mold opening.

Poka-yoke is not about putting the responsibility on the work clothes, but about acknowledging that people will get tired. One less possible wrong direction in the design means one less full inspection process on the production line.