The first piece is not the first good piece
The first piece inspection refers to the full confirmation of the first few products produced after changing molds, materials, shifts or adjusting process parameters. Production is allowed to continue only after passing the standards. It tests not only dimensions, but also appearance, assembly and sealing performance. You cannot pick the best parts when picking them up, but pick them in the order of output, so that you can judge whether the process is stable as soon as it is started.
A common misunderstanding is to regard the first article as a supplement to the random inspection. In fact, a benchmark must be established for the first piece: where does the size of this batch fall in the tolerance zone, whether the color difference and texture of the appearance are close to the previous batch, and whether the compression amount of the sealing ring is within the design range.
The judgment standards must be written into the inspection form in advance and cannot be left to the inspector to make on-the-spot decisions. Which dimensions are considered critical, how much particles and scratches are allowed on the appearance, and the pressure and holding time of the sealing test are all fixed in the form of text and pictures. The standards are clear, and even if you change people or shifts, they won't be out of shape.
Under what circumstances must it be done
The triggering conditions for shell production are relatively clear: the first production of a new mold, resumption of production after mold repair, replacement of aluminum ingots or powder batches, adjustment of die-casting machine and CNC program parameters, resumption of work after a long shutdown, and the first batch after the customer changes the design. The process status of these nodes has changed, and the previous batch of data cannot be used directly.
The first quantity is generally three to five pieces, covering different cavities and different positions of the mold. Take three pieces of the single-cavity mold, one from the initial stage of startup, the stable stage, and the middle of the shift. This way you can see whether the parameters are drifting.
Which items should be inspected and how to judge?
The dimensions should be checked according to the key items marked on the drawing and the assembly-related items, such as the width and depth of the sealing groove, the fit of the seam, and the position of the studs. The appearance should be compared with the sealed sample under a standard light source, and the color difference should be read with an instrument. The assembly should be done once, and the cover plate fit and screw screwing should be checked; waterproof parts should be sampled and tested for airtightness.
- After the first piece is qualified, it will be signed and tagged, and the sample will be left at the workstation;
- If it is unqualified, the line will be stopped, the cause will be found out and then sampled again;
- The data of the first piece will be entered into the batch record and can be traced with the goods;
- The data of three consecutive batches will be stable, and the frequency of inspections can be appropriately relaxed.
Weijiaxin sets the first article confirmation as the necessary node for transfer to batch production, and does not enter the batch without the quality inspection signature. What this level blocks is process drift, not individual defective products.