A batch of waterproof gun shells were inspected and delivered

Final inspection is not the last step of selection

This batch of waterproof gun shells will enter the final inspection area after being completed by the Weijiaxin surface treatment line. First, the first article record and process flow card will be checked according to the batch to confirm that the parameters of the die-casting, machining, and surface treatment stages have not changed, and then the item-by-item inspection will begin. If it is found that a certain parameter has been temporarily adjusted during the verification, first confirm whether the adjustment has a review record, and then decide whether to tighten random inspections for this batch. The function of final inspection is to use data to fix the stability of mass production, rather than to screen out defects in the final step.

The appearance inspection is carried out under a standard light source, and the color difference, flow marks, scratches and powder accumulation are checked against the signed sample. The judgment caliber should be stated in advance: which positions allow slight color differences and which surfaces do not allow any bumps, to avoid different inspectors from giving different conclusions.

Sampling inspection method of air tightness and fit

The sealing of the waterproof gun shell is ensured by the sealing groove, rubber ring and cover screws. During random inspection, assemble a complete sample, inflate and maintain pressure into the shell, and observe the pressure attenuation and leakage point location; the pressure holding time and pressure value are set according to the shell volume. Shells with larger volumes require longer observation time, otherwise small leakage points may be misjudged as qualified. At the same time, conduct a dimensional review of the depth of the sealing groove and the flatness of the cover plate to confirm that the leakage is not caused by a single piece being out of tolerance.

Conduct trial assembly verification on the threads and mating parts. Screw in the front and rear covers, bracket interfaces, and cable outlet holes one by one to check whether they are smooth and whether there is any jamming. Trial samples and mass production parts are drawn from the same batch to avoid gaps between samples and batches.

Connection before packaging and delivery

After the surface treatment of the shell is completed, the most fearful thing is transportation bumps. The lining is slotted and positioned according to the shape, the edges are protected, and the stacking of the whole box is highly controlled; before shipment, confirm the arrival rhythm and unloading conditions with the customer, and attach the batch number, quantity and inspection records. The outer box label indicates the product name, batch, quantity and production date. The font and position are unified, making it easier for customers to scan the code into the warehouse.

  • The batch number, key dimensions, and airtight sampling inspection records are provided with the goods;
  • The box number and corresponding batch are marked on the packing list to facilitate warehousing verification;
  • Samples and mass-produced parts are divided into boxes, clearly marked and not mixed;
  • Retain samples from the same batch for subsequent traceability and comparison.

One week before delivery, production and business will go through the list together: whether the quantity is complete, whether the documents are signed, and whether the vehicle is in place. The same applies to small batch orders, and the process is not discounted based on batch size.

Weijiaxin has fixed this process so that customers can directly go online for assembly after receiving the goods, reducing re-inspection and rework. The meaning of delivery is not only to send out goods on time, but also to save one time of waiting for the next process.

Back to list

Need a housing built for your camera?

Send us your drawings or samples — our engineering team will respond with a feasibility plan and quotation.