The review starts with the failed parts
The Weijiaxin engineering team dismantled the failed parts under typical working conditions in the recent stage and classified them according to the leakage locations: the bottom of the sealing groove, the middle section of the cover plate, the outlet hole, and the edge of the window. After disassembling, observe the width and depth of the indentation of the rubber ring. Intermittent indentations indicate insufficient flange stiffness, and excessive indentations on one side indicate problems with flatness or assembly torque.
After classification, we can see the pattern: most leaks are not caused by the wrong choice of rubber ring material, but because the structural details are not clearly determined in the drawing stage, leaving room for on-the-spot processing in the assembly process. Looking at the failed parts side by side with the drawings, the location of the problem often coincides with the vaguely marked areas on the drawings.
The list falls to drawings and inspection
The review results are compiled into a design inspection list, which is reviewed together with the drawings. The list does not include principle slogans, but only items that can be checked: whether the depth of the sealing groove matches the wire diameter, whether the screw spacing exceeds the limit, whether the flatness of the sealing surface is marked, whether the outlet hole avoids the sealing groove, and whether the window pressing method is clear. Each item corresponds to a measurable acceptance item, and the items should be expressed with numerical values as much as possible to avoid undecidable words such as appropriate and sufficient.
The list simultaneously reverses constraint testing. In the past, we only looked at whether the dimensions fell within the tolerance. Now, indentation inspection and post-assembly airtight spot inspection are added to convey the structural design intention to the production end. Once the inspector gets the list, he knows where to take a second look rather than apply an even force.
Implications for project rhythm
It is much cheaper to prevent problems before mold opening than to change the mold after trial. After the checklist is activated, most hidden dangers of new projects can be exposed during the structural review stage, the number of mold trial rounds will be reduced accordingly, and the time for customers to get samples will be more predictable.
- Check the matching relationship between sealing groove depth, groove width and rubber ring diameter one by one;
- Screw spacing, flange thickness and reinforcing rib position are inspected together;
- The flatness and roughness of the sealing surface are written into the technical requirements of the drawing;
- The sealing methods of outlet holes, windows and ventilation structures are confirmed individually.
The list is not a one-time creation. Every time a project is completed, the engineering team fills in new problems and deletes items that have been optimized by the structure to keep it always available. The version number and effective date are written in the footer, and the version is indicated when citing drawings.
Weijiaxin uses this list as a common tool for the engineering team and updates it with the project version. Only when experience becomes executable can it no longer be lost when personnel change.