Recommendations for waterproofing inspection of housing before rainy season

Check the seals first for stocks and batches waiting to be shipped

At this time of year, customers in South China and Southeast Asia will intensively ask whether the waterproofing of stocks and batches waiting to be shipped should be checked again. The answer depends on storage conditions, but there are a few things that are worth doing no matter how long they are stored, focusing on the condition of seals and mounting surfaces.

When the casing is stored for a long time, the first things to change are the sealing rings and rubber strips. The silicone ring is slightly deformed in high temperature seasons, leaving indentation memory in parts that have been pressed for a long time. After installation, the rebound is insufficient and the compression amount is reduced. During the inspection, remove the rubber strip to see if the section can be restored to its original shape. If the indentation depth exceeds 20% of the section, it should be replaced with a new one.

Foreign matter in the sealing groove must also be cleared. Aluminum chips, powder particles, and release agent residues will lift up the rubber strip during assembly, forming an invisible water seepage channel. Wipe the bottom of the tank with a lint-free cloth dipped in absolute ethanol, and then blow dry with an air gun. This step is more practical than any instrument in re-inspection.

Two inspection methods: air tightness and water pressure

After the whole machine is assembled, make air tight first, immerse the shell in the water tank or pressurize the cavity to observe the pressure drop. This can detect seal failure without water entering, and the cost of rework is low. After the airtightness is qualified, it will be exposed to rain or short-term water immersion, and the two high-risk locations of the outlet hole and the lens window will be verified. Only if both of them pass can the batch be considered ready for shipment.

The outlet hole is the most concentrated location for water seepage. The key point is to check whether the locking ring of the waterproof connector is pressed in place and whether the cable outer sheath is stuck. Check the lens window to see if the glue layer is continuous. If there are bubbles and gaps on the edge, it will be judged as unqualified. Use a magnifying glass to go around in a circle, which is much more effective than just looking at the front.

Make the re-inspection into a traceable record

  • The number of random inspections and the judgment standards are implemented as agreed by the customer, and the form records the proportion of random inspections;
  • The airtight pressure drop and pressure holding time are written into the record , abnormal parts are individually marked and isolated;
  • The rain angle and duration are simulated according to the actual installation posture, and vertical spraying is not uniform;
  • The shell after re-inspection is repacked, desiccant is placed in the bag and the re-inspection date is marked.

Most water seepage problems in the rainy season are not design failures, but loose storage and assembly links. Weijiaxin conducts a round of waterproofing project re-inspections on production and inventory batches at this node of the year, and records the conclusions and replaced seals in the batch files. Customers can trace the records when they receive the goods.

Back to list

Need a housing built for your camera?

Send us your drawings or samples — our engineering team will respond with a feasibility plan and quotation.